Prize37 Chapter 4, Exercise 3 Short answers on water supply Task (a) Why is the summit the hardest part of a canal to keep full? (b) What does back-pumping do, and when would an engineer choose it over a new reservoir? (c) Why do locks, rather than evaporation, usually dominate the water budget of a busy canal? Answer (a) The summit is the highest pound, so no river or stream can run into it from higher ground by gravity unless a source exists above it. It loses water through the locks on both sides, as well as leaks and evaporation, and everything lost must be brought in from reservoirs, higher streams or pumps. (b) Back-pumping lifts water that has already run down the locks from a lower pound back up to the summit, so the same water is used again. An engineer would choose it where there is no suitable valley for a reservoir, or no higher river to feed from, or where the land is too valuable or the dam too costly, as long as energy and an engine house can be provided (check). (c) Each passage moves a whole chamber of water (about 106 cubic metres for a narrow lock) from one pound to the next, repeated many times a day. Evaporation takes only a few millimetres a day from the surface. In this chapter's sums the lock water was over four-fifths of the total demand, and evaporation under 2 percent.