Canals Today

How Canals and Locks Work

Chapter 8 · Canals Today

Chapter 7 showed how a canal crosses the land: over valleys, through hills, along banks and cuttings. This last chapter asks what has become of all that work. Most of the working canals of the eighteenth and nineteenth centuries lost their cargoes to railways and lorries, and many were abandoned. Yet the story did not end there. Some canals grew into vast ship canals that carry the world's trade, some were rescued by volunteers and reborn as places for leisure boating, and all of them depend on steady maintenance. We finish by looking at what a waterway is good for in the twenty-first century.

What was run, and what to trust
The two Python snippets and the exercise solutions were executed and the output shown is exactly what Python printed. As in How Canals and Locks Work 7, sizes, costs and cargo weights are round illustrative assumptions, not measurements of a particular canal. Historical and current facts quoted from memory are marked (check).

Ship Canals and Sea Locks

A ship canal is a canal built for seagoing vessels instead of barges. The principles are exactly those of Chapters 1 to 7, scaled up: a level pound, a lock at each change of level, gates, valves and a reliable supply of water. The Suez Canal in Egypt, opened in 1869, joins the Mediterranean to the Red Sea; because the two seas are at nearly the same level it needs no locks at all (check). The Panama Canal, opened in 1914, has to climb over the isthmus, and so uses a series of enormous locks that lift ships up to an artificial lake and down again (check). In Britain, the Manchester Ship Canal, opened in 1894, carries sea-going ships some 36 miles inland to Manchester through a series of locks (check).

A sea lock is a different animal again. It sits where a canal meets the tidal sea, and it has to cope with a water level on one side that rises and falls twice a day. The gates may have to hold back water from either direction, so many sea locks have pairs of gates facing both ways (check). Compare the water a sea lock uses with a narrow lock. Here, a sea lock chamber 200 metres by 25 metres is lifted by 6 metres, against a narrow lock 21 metres by 2.1 metres lifting 2.4 metres:

narrow = 21.0 * 2.1 * 2.4 # narrow lock: length x width x lift, m3 (assumed) sea = 200.0 * 25.0 * 6.0 # sea lock chamber: length x width x tide difference, m3 (assumed) print("narrow lock fill (m3):", round(narrow, 1)) print("sea lock fill (m3):", round(sea)) print("sea lock = this many narrow locks:", round(sea / narrow)) tons_per_ship = 20000 # tonnes of cargo in one ship (assumed) tons_per_boat = 0.5 # tonnes carried by a leisure boat (assumed) print("sea lock water per tonne of cargo (m3):", round(sea / tons_per_ship, 2)) print("narrow lock water per tonne of cargo (m3):", round(narrow / tons_per_boat)) # Output: # narrow lock fill (m3): 105.8 # sea lock fill (m3): 30000 # sea lock = this many narrow locks: 283 # sea lock water per tonne of cargo (m3): 1.5 # narrow lock water per tonne of cargo (m3): 212

The sea lock needs about 30,000 cubic metres of water, as much as the fill of roughly 283 narrow locks. At first glance that looks wasteful, but the last two lines tell the real story. Per tonne of cargo, the sea lock uses about 1.5 cubic metres, whereas the narrow lock uses over 200. A big ship moving a great deal of cargo makes much better use of its water, which is one reason the size of vessels has grown whenever canals have allowed it (check). It also connects back to Chapter 4: the water supply, not the lock itself, sets the limit on traffic.

Leisure Boating and Restoration

By the middle of the twentieth century many British canals had fallen out of use, with locks rotting, channels silted up and bridges replaced by culverts. The turning point came when enthusiasts and volunteers began campaigning to save them. The Inland Waterways Association was founded in 1946, and over the following decades volunteers and local councils reopened one canal after another for pleasure boats (check). Today the system carries holidaymakers, anglers, walkers, cyclists, and people who live on their boats, and the towpath that once carried a horse is now a green path through towns (check). A restored canal is also a valuable asset: it attracts visitors, supports small businesses, and is a corridor for wildlife (check).

Restoration is never cheap, and never all at once. A canal trust with a fixed budget must decide which jobs to do first. A sensible method is to rank jobs by how much benefit each gives per pound spent, and to give safety work, like a leaking embankment, a high benefit score, since a breach is both dangerous and costly. The program below works through a fictional canal. The costs, in thousands of pounds, and the benefit scores out of 10 are all assumed.

jobs = [ # (name, cost in thousands of pounds, benefit score 1-10), all assumed ("repair leaking embankment", 400, 9), ("rebuild three locks", 900, 8), ("clear towpath and dredge", 150, 6), ("restore a visitor basin", 300, 5), ("replace a tunnel lining", 1200, 7), ] budget = 1000 # thousands of pounds available this year (assumed) ranked = sorted(jobs, key=lambda j: j[2] / j[1], reverse=True) spent = 0 for name, cost, benefit in ranked: ok = spent + cost <= budget if ok: spent += cost print(name, "| benefit per 100k:", round(100 * benefit / cost, 2), "|", "funded" if ok else "waits") print("spent (thousands):", spent) # Output: # clear towpath and dredge | benefit per 100k: 4.0 | funded # repair leaking embankment | benefit per 100k: 2.25 | funded # restore a visitor basin | benefit per 100k: 1.67 | funded # rebuild three locks | benefit per 100k: 0.89 | waits # replace a tunnel lining | benefit per 100k: 0.58 | waits # spent (thousands): 850

The cheap towpath and dredging job ranks first, the embankment repair second and the visitor basin third. Together they use 850 of the 1,000 available; the three locks would need 900, which does not fit in what is left, so they wait for next year, and so does the tunnel lining. Notice that the ranking does not say the locks are unimportant, only that, given this budget, spending it on cheaper jobs gives more total benefit. A real trust would also weigh what must be done to keep the whole route connected, since a canal with one blocked lock is a canal that cannot be used end to end (check).

Maintenance: The Work That Never Ends

A canal is never finished. Gates swell, shrink and rot, and are replaced on a cycle of a couple of decades (check). Silt settles in the channel and has to be dredged so that boats do not run aground. Banks erode, leaks open up, lock walls bulge, and every one of the structures of Chapters 3 to 7 needs inspection. Reservoirs are checked under reservoir safety law (check). Vegetation grows into the water, and invasive plants need control. Much of this is done in the winter, when boat traffic is low, during a programme of winter stoppages, when a lock or a length of canal is drained behind stop planks (Chapter 7) and the crews can work in the dry (check).

There is an old rule of thumb that small repairs done early are far cheaper than large repairs done late, which is why inspection matters as much as repair: a damp patch on an embankment is a cheap job today and an expensive emergency after a breach (check).

The Future of Waterways

What will canals be used for next? Several answers are already visible. They still carry some freight: barges move bulk goods on larger waterways and, in places, into cities, and a loaded barge uses far less fuel per tonne than a lorry (check). They offer water transfer, moving water from where there is plenty to where there is a shortage (check). They provide green corridors for wildlife and for walkers and cyclists. Canal water can also be used for heat: heat pumps can draw warmth from the water to heat nearby buildings (check). Boats are moving to electric and hybrid engines, which are quiet and clean, and charging points are appearing at moorings (check). And as the climate changes, engineers are asking how to manage more extreme rain and drought, with the same tools as before: reservoirs, feeders, overflow weirs and careful control of the water.

FeatureShip canalWorking narrow canal (past)Leisure canal (today)
Main trafficsea-going shipshorse-drawn cargo boatspleasure boats, walkers, anglers
Lockshuge chambers, or none at allnarrow, one boat at a timethe same narrow locks, restored
Water per tonne of cargolowhighnot a cargo question
Main challengekeeping a big channel open and suppliedcompeting with road and railpaying for maintenance and restoration
Typical aidsea locks, dredgingtowpath, horse, stablesvolunteers, trusts, grants
Common mistakes
Thinking a ship canal always needs locks (a canal linking two seas of the same level needs none); judging a lock by the water it uses rather than the water per tonne of cargo; assuming a restored canal stays restored without regular maintenance; and assuming that a low rank in a benefit-per-pound list means a job is unimportant (it may only be too expensive for this year's budget).

Challenges

Exercise 1

A sea lock chamber is 150 metres long, 15 metres wide and lifts by 4 metres. How many cubic metres of water does one fill take, and how many narrow locks (21 metres by 2.1 metres, lift 2.4 metres) is that? If the ship carries 5,000 tonnes of cargo, how many cubic metres of water is that per tonne?

📄 View solution
Exercise 2

A trust has 600 thousand pounds for a fictional disused canal. The jobs are A (cost 200, benefit 8), B (cost 500, benefit 9), C (cost 100, benefit 3) and D (cost 250, benefit 6). Rank them by benefit per cost, fund them in that order while they fit, and say what is funded and what is left over.

📄 View solution
Exercise 3

Short answer. (a) Why does a sea lock often have gates that face both ways? (b) Why is a lock for a big ship more water-efficient per tonne of cargo than a narrow lock? (c) Name two things a canal can be used for today other than carrying boats.

📄 View solution

Summary

Key points
  • Ship canals: the same ideas as small canals, scaled up; some need locks, some none
  • Sea locks: cope with tides, so gates may need to hold back water from both sides
  • Leisure and restoration: volunteers and trusts brought canals back; money is limited, so jobs are ranked
  • Maintenance: never finished; inspect early, repair in the winter stoppage
  • Future: freight, water transfer, wildlife corridors, heat and electric boats
Course complete
Over eight chapters you have followed a canal from its first reason for existing to its modern uses: why water carries heavy loads (Chapter 1), how a level is held and kept watertight (Chapter 2), what happens inside a lock (Chapter 3), where the water comes from (Chapter 4), how locks are grouped into flights and staircases (Chapter 5), how lifts and inclines replace locks (Chapter 6), how canals cross and cut through the land (Chapter 7), and how they are used and cared for today. The best next step is practical: walk a stretch of towpath, watch a boat work through a lock, and name each part you see. Follow-on courses on related engineering topics may be added in future.