Chapter 1 showed why a boat on still water is so easy to pull: there is almost no resistance. That only works if the water really is still. A canal is a long thin lake built on sloping ground, and water does two awkward things: it runs downhill, and it soaks into the ground. This chapter is about how builders cope with both, by keeping canals level and by making the bed hold water.

What was run, and what to trust
The Python snippets and the three exercise solutions were executed and the output shown is exactly what Python printed. As in How Canals and Locks Work 1, the inputs (lengths, widths, lift heights, seepage rates) are round illustrative assumptions, not measurements from a particular canal. Historical facts quoted from memory are marked (check).

Water Finds Its Level

If you tilt a bath, the water rushes to the low end. A canal is the same: a stretch of still water has a flat surface, however the ground beneath it slopes. A stretch of canal held at one level is called a pound. Along its whole length the surface is level, and the depth is greater where the ground dips and smaller where it rises, so builders dig and bank up the bed to keep a steady depth for the boats.

A pound ends at a lock (the subject of How Canals and Locks Work 3) or at the end of the canal, where the next pound sits at a different height. So the real question for a builder is: how do I get from A to B at a set of fixed levels, with as few steps as possible?

Contour Canals: Going Round the Hill

The cheapest way to avoid steps is to follow a hillside at a constant height, a contour, and let the route wind to keep its level. Many early British canals were contour canals, and the Oxford Canal, for instance, is famous for its winding course (check). The price is distance. The sum below compares a straight route over a hill, which needs locks, with a longer contour route that does not. The speeds, lock lift and lock time are assumed.

rise = 24.0 # m, height gained crossing the hill lock_lift = 2.4 # m per lock (assumed) direct_km = 10.0 contour_km = 17.0 walk_kmh = 3.2 # horse and boat at walking pace (assumed) lock_minutes = 15 # minutes per lock passage (assumed) locks = round(rise / lock_lift) direct_h = direct_km / walk_kmh + locks * lock_minutes / 60 contour_h = contour_km / walk_kmh print("locks on direct route:", locks) print("direct route hours:", round(direct_h, 1)) print("contour route hours:", round(contour_h, 1)) # Output: # locks on direct route: 10 # direct route hours: 5.6 # contour route hours: 5.3

The contour route is 7 km longer but a little quicker, because ten lock passages cost two and a half hours. It also needs no lock keepers and spends no water on lockage. But the straight line is shorter to dig and build, so neither is automatically right: the sum has to be done for each hill.

FeatureContour canalCanal with locks
Routelong, windingshorter, straighter
Height changenone, one levelstepped, pound by pound
Journey timeno lock delayseach lock adds minutes
Water supplyneeds only to replace leaksevery passage also uses water
Stafffewlock keepers or boaters to work locks
Weaknessa long bank on a hillside that can slip or leakdelays and water demand

Keeping Water In

Even on perfectly level ground, a canal loses water downward and sideways through the bed and banks. Sand and gravel drain freely. Clay holds water well. If the route crosses porous ground, the builders must seal the channel. How much does it matter? The code below uses a 10 km pound and assumed seepage rates (the depth of water lost per day).

length_m = 10_000 # a 10 km pound width_m = 10 # average water surface width (assumed) depth_m = 1.5 # assumed area = length_m * width_m volume = area * depth_m print("pound volume (m3):", volume) # seepage as depth of water lost per day through the bed and banks (assumed values) seep_mm_day = {"bare earth": 20, "poorly puddled": 5, "good puddled clay": 1} for name, mm in seep_mm_day.items(): lost = area * mm / 1000 print(name, "loses", round(lost), "m3 per day,", round(lost / volume * 100, 1), "% of the pound") # Output: # pound volume (m3): 150000.0 # bare earth loses 2000 m3 per day, 1.3 % of the pound # poorly puddled loses 500 m3 per day, 0.3 % of the pound # good puddled clay loses 100 m3 per day, 0.1 % of the pound

A percent or so a day looks small, but it is lost every day, without a boat in sight, and the shortfall must be fed in from a reservoir or stream (the topic of How Canals and Locks Work 4). Bare earth loses twenty times as much as good puddling. In a canal with a thin water supply, that difference decides whether boats can float all summer.

Puddled Clay

Puddling means working wet clay, usually mixed with sand or gravel, until it becomes a dense, tough, nearly watertight skin. Workers originally trampled it with their feet, and later machines helped (check). The best-known name is James Brindley, who is associated with puddled clay lining on the Bridgewater Canal (check). Typically the clay is laid in layers around the bed and banks, kept damp while it is worked, and kept covered or filled, because a dry clay lining cracks. Stone or brick lining, and later concrete, were used where clay was not enough or where a bank needed strengthening (check).

Common mistakes
Believing the water in a canal flows along it like a river (it is almost still, and any flow comes from a lock being used or a leak); picturing the canal bed as flat in cross-section (it is shaped, usually deeper in the middle); and assuming a leak is only a problem for the water bill (a leak can also wash away a bank, which is how many canal breaches begin, check).

Challenges

Exercise 1

A canal must gain 18 m of height. Option A goes straight over: 8 km long, with locks that each lift 3 m and take 20 minutes. Option B is a contour canal with no locks, 13 km long. Boats travel at 3 km/h. Find the time each way and say which is quicker; then name two other things you would weigh up before choosing.

📄 View solution
Exercise 2

A pound is 4 km long, 8 m wide and 1.2 m deep. Assume seepage of 10 mm of depth per day if unlined, 2 mm per day if puddled. Find the volume lost per day each way, the days for the level to fall 0.15 m with no top-up, and how many 21 m x 2.1 m x 2.4 m lock chambers the daily leak would fill.

📄 View solution
Exercise 3

Short answer. (a) What is a pound, and why must the water in one stay level? (b) Give two reasons a builder might choose a contour route. (c) Name two ways to keep water in a canal bed, and say what puddling solves that bare soil does not.

📄 View solution

Summary

Key points
  • Pound: a level stretch of canal between locks
  • Contour canal: follows a hillside at one height: longer, but no locks
  • Leakage: a small percentage a day adds up, and must be replaced from a water supply
  • Puddled clay: worked wet clay that cuts seepage many times over bare earth; it must stay damp
  • Trade-off: distance against locks, digging against leaks
Coming next
How Canals and Locks Work 3 looks inside a lock: the chamber, the gates and paddles, the fill and empty cycle, and why mitre gates close themselves tighter under pressure.