prize41-7, Exercise 3: Track Bed and Paying Up Front Model answer (check the details): - The rail carries the wheels. Rails are fixed to sleepers (cross-pieces, mostly timber), which spread the load and keep the rails the right distance apart. The sleepers sit in ballast, broken stone that holds them in place and lets rainwater drain away. - A good route costs more to build, with cuttings, embankments, tunnels and viaducts, but every train then runs more cheaply, faster and more safely for the life of the line. - Modern parallel: a well-designed network or codebase costs more at the start, but a shortcut ("technical debt") or a poor topology costs more every day it stays and is very expensive to fix later. Care: rail and sleeper materials changed over time (cast iron, wrought iron, steel; timber, stone, later concrete), so say which period you mean.