The Space Shuttle Era: Ambition & Real Tragedy

History of Space Exploration

Chapter 7 · The Space Shuttle Era: Ambition & Real Tragedy

After Apollo (Chapters 5 and 6), the United States built a reusable spacecraft, the Space Shuttle, which flew from 1981 to 2011. This chapter covers the programme and the two accidents that killed fourteen astronauts, Challenger in 1986 and Columbia in 2003. The sources are three reference articles. The two accident reports agree that the causes were organisational as well as technical, and the chapter keeps both parts.

The Programme

FeatureWhat the source says
First launch12 April 1981 (STS-1).
Final flight21 July 2011 (STS-135).
Flights135 missions.
FleetFive operational orbiters, plus the test orbiter Enterprise.
Cost"$450 million (2011)" per launch, against a total project cost of "$211 billion (2012)."
AchievementsDeployed the Hubble Space Telescope and serviced it several times, took part in building and servicing the International Space Station, and launched satellites and interplanetary probes.
Reusable, but Not Cheap The source says the programme promised savings through reusability, and its own cost per launch suggests each flight stayed expensive. It does not say what the original cost or flight-rate targets were, so the chapter cannot measure how far the programme fell short. The two figures are also in different years' dollars, 2011 and 2012, and I did not adjust them.

Challenger, 28 January 1986

The crew was Commander Dick Scobee, Pilot Michael J. Smith, Mission Specialists Ellison Onizuka, Judith Resnik and Ronald McNair, Payload Specialist Gregory Jarvis, and the teacher Christa McAuliffe. The orbiter "broke apart 73 seconds into its flight" at 46,000 feet above the Atlantic, killing all seven.

The Technical Cause

An O-ring seal failure in the right solid rocket booster, at a record-low temperature (8 degrees F at the booster). Cold stiffened the rubber, reducing its sealing ability. Hot pressurised gas leaked through the joint, burned through structural attachments and caused catastrophic structural failure.

The Warning

Morton Thiokol engineers expressed concerns about O-ring performance below 53 degrees F. Robert Lund and Joe Kilminster recommended against launching until it warmed. The source says management reversed this position, calling the evidence "inconclusive."

The Commission

The Rogers Commission found the O-ring failure was the cause and criticised NASA and Morton Thiokol for overlooking evidence of danger. It found "the safety culture and management structure at NASA were insufficient."

The source says the commission emphasised that NASA "accepted the risk of O-ring erosion without evaluating" the safety implications, and that "pressure to increase the rate of flights negatively affected" training and quality control. The physicist Richard Feynman demonstrated the O-ring's brittleness in cold water during televised hearings, advocating harsher criticism of NASA. The shuttle remained grounded for 32 months and returned to flight in September 1988.

What the Sources Leave Open The source does not say who decided to launch, whether the reversal was directed from above the engineers, or what happened to the crew after the break-up. I did not find those, and the chapter does not describe them. "Management reversed this position" is the article's summary, and it does not name the people involved.

Columbia, 1 February 2003

Columbia disintegrated on re-entry over Texas and Louisiana, killing Commander Rick Husband, Pilot William McCool, Michael Anderson, Kalpana Chawla, David Brown, Laurel Clark and payload specialist Ilan Ramon.

StageWhat the source says
Launch, 16 January 2003Foam insulation broke from the external tank's left bipod attachment at 81.7 seconds and struck the left wing's reinforced carbon-carbon panels at about 625 to 840 feet per second.
In orbitThe breach went undetected during the 16-day mission.
Re-entryHot gases penetrated the damaged thermal protection system, melting internal wing structures and causing the orbiter to lose control and break apart.

The Investigation Board's Findings

The Columbia Accident Investigation Board identified technical and organisational failures. Technically, the foam strike caused the breach. Organisationally, NASA had normalised the risk of foam strikes as an "accepted flight risk" despite previous damage. The source quotes the board: "Program operating costs were lowered by 21% from 1991 to 1994" while aggressive launch schedules were maintained, creating pressure that discouraged safety escalation.

The Same Pattern Twice Challenger: a known erosion problem accepted, and pressure to fly more often. Columbia: a known foam problem accepted as a flight risk, and pressure from cost and schedule. That is my comparison, but the two articles use the same kinds of terms (accepted risk, schedule pressure). The Columbia article's "normalised" is the board's word, and I do not know whether the Rogers Commission used it.

Could the Crew Have Been Saved?

The board concluded the crew could theoretically have survived if NASA had requested Defense Department imaging of the wing damage, managers had authorised a mission extension to about 15 February, and a rescue mission using Atlantis had been launched. On-orbit repair prospects were deemed "low" in likelihood of success.

Three Conditions, One Verdict The source gives all three conditions as needed together, and it says "theoretically." I do not know how likely the board thought the combined rescue was, and the source does not say. The chapter does not go beyond "theoretically."

The End of the Programme

Columbia's grounding lasted 29 months. Return-to-flight missions (STS-114 in July 2005, STS-121 in July 2006) required redesigns, including removal of bipod foam and addition of inspection equipment. President Bush's 2004 Vision for Space Exploration directed the fleet to complete the International Space Station and retire by 2010. Retirement occurred in 2011, after Atlantis's final flight, and the United States then relied on Russian Soyuz spacecraft until commercial alternatives emerged. The Columbia article says no American crewed spacecraft launched again until SpaceX's 2020 Crew Dragon mission.

What I Did Not Verify I did not find the shuttle's design decisions, why the programme's flight rate fell short, the individual orbiters' histories, Hubble and station missions in detail, how the retirement date was chosen, or the families' and survivors' accounts. I also did not check the cost totals. The chapter reports two accident findings and headline programme figures.

Hands-On Exercises

Exercise 1

Set out the technical and organisational causes of each accident as the chapter gives them, and list what the chapter does not say about each.

Exercise 2

A student writes "The shuttle was cheap because it was reusable." Use the chapter to answer it.

Exercise 3

Explain why the chapter's comparison of the two accidents is presented as my own, and what a historian would need to compare the two commissions' conclusions properly.

Quick Reference

  • Programme: 12 April 1981 to 21 July 2011; 135 flights; five orbiters; $450 million per launch (2011)
  • Challenger: 28 January 1986; 73 seconds; O-ring, cold; Thiokol warning below 53 degrees F; grounded 32 months
  • Columbia: 1 February 2003; foam strike at launch; normalised risk; grounded 29 months
  • Rescue: theoretically possible only if three conditions were all met
  • After: retired 2011; reliance on Soyuz until Crew Dragon in 2020
  • Not covered: the design, the flight-rate targets, the individual accounts